 | 1 of 13: More detail Series: D165646 Image#: 4 Date: ca. 1975 St. Joseph Hospital. A prominent landmark in the Tacoma skyline is the futuristic design of the new St. Joseph Hospital located at 1718 South I. The round "porthole" windows, "cloverleaf" sections and narrow supporting "legs" were in sharp contrast to the older hospital of the same name, located a block away. There was room for 262 patients and the facility included ten surgeries. Nursing stations were designed to allow one registered nurse to monitor seven patient rooms. St. Joseph would undergo further expansion in the coming years including an outpatient addition. Photograph ordered by Bertrand Goldberg & Associates, Chicago. (TNT 12-12-74, A-2-article) |  | 2 of 13: More detail Series: D165646 Image#: 3 Date: 02-20-1975 Completed St. Joseph's Hospital. The uniquely designed hospital was 189 feet tall and 14 stories. Built at a cost of about $13,000,000, the hospital was reportedly the first in the world to use a circular floor design. Walls were ten inches thick and there was enough concrete used in the building construction for five miles of freeway. The hospital was dedicated on December 15, 1974 and accepted its first hospital transfer on January 31, 1975, three weeks later than first scheduled. Photograph ordered by Bertrand Goldberg & Associates, Chicago. (TNT 1-24-74, D-4 article; TNT 12-12-74, A-2-article) |  | 3 of 13: More detail Series: D163077 Image#: 3C Date: 03-05-1973 Overhead look at construction workers on the job building the new St. Joseph Hospital. The men will soon be pouring concrete forms. The hospital, with its unusual curvilinear style, used 22,000 tons of concrete in its construction. The 14-story, 189-foot tower would be dedicated on December 15, 1974. Color photograph ordered by Baugh Construction Co., general contractors of the project. |  | 4 of 13: More detail Series: D163000 Image#: 336C Date: ca. 1973 1973 Richards stock footage. Construction was well underway in 1973 regarding St. Joseph's curvilinear styled hospital tower on South "I" St. As this aerial view indicates, two stories of the eventual 189-feet, 14-story tower have been built. 22,000 tons of concrete would be used for construction. The new hospital would be dedicated on December 15, 1974. The old St. Joseph Hospital, across the street in the 1800 block of South "I," would be demolished in 1982. |  | 5 of 13: More detail Series: CYS Image#: T379 Date: ca. 1979 View in the distance of the new (1974), sparkling white St. Joseph's Hospital, 1718 So. I St., circa 1979. |  | 6 of 13: More detail Series: CYS Image#: T367 Date: ca. 1979 The curved outline of the new (1974) St. Joseph's Hospital, circa 1979. |  | 7 of 13: More detail Series: CYS Image#: T366 Date: ca. 1979 The curved outline of the new (1974) St. Joseph's Hospital, circa 1979. |  | 8 of 13: More detail Series: CYS Image#: T324 Date: ca. 1979 The Light and Water Co. standpipe (left,) 1923 So. J St. and the curved lines of the new St. Joseph Hospital, 1718 So. I St., circa 1979. The standpipe was completed in 1890 and the hospital in 1974. |  | 9 of 13: More detail Series: CYS Image#: T318 Date: ca. 1979 Detail on the new (1974) St. Joseph's Hospital, 1718 So. I St., circa 1979. |  | 10 of 13: More detail Series: CYS Image#: T315 Date: ca. 1979 View in the distance of the new (1974) St. Joseph's Hospital, 1718 So. I St., circa 1979. |  | 11 of 13: More detail Series: CYS Image#: T305 Date: ca. 1979 View in the distance of the new (1974) St. Joseph's Hospital, 1718 So. I St., circa 1979. |  | 12 of 13: More detail Series: CYS Image#: T141 Date: ca. 1979 Pictured in the center distance are the curved lines of the new (1974) St. Joseph's Hospital, 1718 So. I St., circa 1979. |  | 13 of 13: More detail Series: CYS Image#: T140 Date: ca. 1979 Pictured in the right distance are the curved lines of the new (1974) St. Joseph's Hospital, 1718 So. I St., circa 1979. |
|